You can’t put this on me! The onus of proving a failure to mitigate loss cannot be shifted
Ceerose Pty Ltd v The Owners – Strata Plan No 89074 [2025] NSWCA 235 Andrew Hales | Zar Chavla (more…)
Urgency tips the scales in ordering delivery of materials upon termination
Alinta Cogeneration Pty Ltd v Shanghai Electric Power Design Institute Co. Ltd [2025] WASC 455 Tom French | Naoisa McNelis (more…)
Injunction granted – limits of certifying liquidated damages post take-out or termination
Cobolt Constructions Pty Ltd v Duke Ventures Wellington Street Pty Ltd [2025] VSC 609 Chris Hey | Michael Lo | Isabella Nicolaci (more…)
Frankie says relax: existence of construction contracts and email specification requirements
Kumar v Frankies Cranes Pty Ltd [2025] NSWSC 1264 Ben Fuller | Andrew Black | Elizabeth Harris (more…)
Double trouble: Two statements of claim allowed to enforce subcontractor’s charge
JTS Trading Group Pty Ltd v Allroads Pty Ltd (in liq) [2025] QSC 211 Michael Creedon | Clare Turner | Gabriela Roworth (more…)
Payment results in withdrawal of adjudication application
Downer EDI Rail Pty Ltd v DT Infrastructure Pty Ltd [2025] QSC 212 Sian Keast | Stephanie Murphy | Charlotte Kath (more…)
One job: The outcome nobody asked for
Tomkins Commercial & Industrial Builders Pty Ltd v Starline Interiors Pty Ltd [2025] QSC 226 Sarah Ferrett | Hazal Gacka | Oliver Conroy (more…)
A deeming clause is ineffective for determining service of payment claims
Roberts Co (NSW) Pty Ltd v Sharvain Facades Pty Ltd (Administrators Appointed) [2025] NSWCA 161 Andrew Hales | Rachel Cheung | Isabella Waters (more…)
SOP Act no barrier to genuine offsetting claims for a statutory demand
Grounded Construction Group Pty Ltd v KW Civil & Construction Pty Ltd [2025] WASC 307 Tom French | Shevaun Stringer | Sasha Thomas (more…)
Payment claims: Not for the uninformed observer
Bridgeman Agencies Pty Ltd v S.E. QLD Plumbing & Drainage Pty Ltd [2025] QSC 167 Andrew Orford | Olivia Doonas | Rose Dillon (more…)