Drilling down on expert evidence
Drill Engineering & Pastoral Company Pty Ltd v Seymour & another [2022] QDC 1361 Julie Whitehead | Elissa Morcombe | Eva Squire (more…)
A late adjudication decision in NSW is unlikely to be void
Demex Pty Ltd v Marine Civil Contractors Pty Ltd & Anor [2022] QSC 141 Andrew Orford | Petrina Macpherson | Alisha McGrady (more…)
Don’t build outside the lines!
Paridaen & Anor v Mahaside Pty Ltd [2022] QSC 109 David Pearce | Sam Rafter | Yibing Mao (more…)
Rage against the machinery: a quantum assessment of loss for faulty equipment
Damon’s Earthworks Pty Ltd v AA Machinery Pty Ltd [2022] QDC 123 Michael Creedon | Alexandria Hammerton | Alisha McGrady (more…)
Design imitation – flattery or just a breach of copyright?
Look Design and Development Pty Ltd v Edge Developments Pty Ltd & Flaton [2022] QDC 116 Michael Creedon | Hazal Gacka | Alisha McGrady (more…)
They who move must prove – WHS entry permits
Enco Precast Pty Ltd v Construction, Forestry, Maritime, Mining and Energy Union & Ors [2022] QCA 94 Deanna McMaster | Allie Flack | Renee Shike (more…)
To plead is human, to demonstrate causation is divine
The Corporation of the Franciscan Sisters of the Heart of Jesus (Qld) v FERM Engineering Pty Ltd [2022] QSC 102 Sarah Ferrett | Megan Sharkey | Zariyah Ahmed (more…)
Running down that hill – increased water flow a nuisance to downhill neighbours
Graham & Anor v Alic & Anor [2022] QDC 106 Andrew Orford | Allie Flack | Eva Squire (more…)
Costs implications of failing to justify Calderbank offers
Toohey v Golder & Ors (No. 2) [2022] QSC 93 David Pearce | Matt Hammond | Renee Shike (more…)
Christmas shut down: Contractual payment regime read down to align with BIF Act
Allencon Pty Ltd v Palmgrove Holdings Pty Ltd [2022] QDC 90 Andrew Orford | Petrina MacPherson | Eva Squire (more…)