VIC

Injunction granted – limits of certifying liquidated damages post take-out or termination 

Cobolt Constructions Pty Ltd v Duke Ventures Wellington Street Pty Ltd [2025] VSC 609 Chris Hey  |  Michael Lo | Isabella Nicolaci (more…)

Limits of contractual illegality and estoppel

Merkon Constructions Pty Ltd v Residence Company Pty Ltd [2025] VSC 151 Chris Hey  |  Michael Lo  |  Meg Reid (more…)

No grounds for renegotiation: contractual interpretation and implied terms

Beecham Motors Pty Ltd v General Motors Holden Australia NSC Pty Ltd [2025] VSC 125 Chris Hey  |  Michael Lo  |  Dan Dowling (more…)

Indirect references to SOP Act not enough for statutory demands

Re Roberts Construction Group Pty Ltd [2024] VSC 679 Chris Hey  |  Michael Lo  |  Millie Lewis (more…)

Jurisdictional fact or fiction – can the court decide?

Roberts Construction Group Pty Ltd v Drummond Carpentry Services Pty Ltd [2024] VSC 246 Nikki Miller  |  Isobel Carmody  |  Madeleine Matkowsky (more…)

Domestic building disputes: assessing damages based on demolition and reconstruction

Whitaker v F.P & H.S Keogh Pty Ltd (Building and Property) [2024] VCAT 708 Chris Hey  |  Michael Lo  |  Stacey Clough  (more…)

Variations must comply with the Domestic Building Contracts Act 1995 (Vic)

Stewart v Sherridon Pty Ltd [2024] VCC 1023  Chris Hey  | Michael Lo  |  Stacey Clough (more…)

Contracting by correspondence – the effect on the validity of payment claims

Samco Steel & Precast Pty Ltd v Roxton Commercial Builders Pty Ltd [2024] VCC 783   Chris Hey  |  Isobel Carmody |  Courtenay Wood (more…)

Repudiation: Actions may speak louder than words

Makland Constructions Pty Ltd v Page Steel Fabrications Pty Ltd [2024] VSCA 142 Chris Hey  |  Michael Lo  |  Jesse Guo  (more…)

Claiming rectification costs, excluded amounts and judicial review in Victoria

Hanson Construction Materials Lty Ltd v Decmil Australia Pty Ltd [2024] VSC 361 Chris Hey  |  Michael Lo  |  Jasmine Reilly (more…)