QLD

Rage against the machinery: a quantum assessment of loss for faulty equipment

Damon’s Earthworks Pty Ltd v AA Machinery Pty Ltd [2022] QDC 123 Michael Creedon  |  Alexandria Hammerton  |  Alisha McGrady (more…)

Design imitation – flattery or just a breach of copyright?

Look Design and Development Pty Ltd v Edge Developments Pty Ltd & Flaton [2022] QDC 116 Michael Creedon  |  Hazal Gacka   |  Alisha McGrady (more…)

They who move must prove – WHS entry permits

Enco Precast Pty Ltd v Construction, Forestry, Maritime, Mining and Energy Union & Ors [2022] QCA 94 Deanna McMaster | Allie Flack | Renee Shike (more…)

To plead is human, to demonstrate causation is divine   

The Corporation of the Franciscan Sisters of the Heart of Jesus (Qld) v FERM Engineering Pty Ltd [2022] QSC 102 Sarah Ferrett   |  Megan Sharkey  |  Zariyah Ahmed (more…)

Running down that hill – increased water flow a nuisance to downhill neighbours   

Graham & Anor v Alic & Anor [2022] QDC 106 Andrew Orford  |  Allie Flack |  Eva Squire (more…)

Costs implications of failing to justify Calderbank offers   

Toohey v Golder & Ors (No. 2) [2022] QSC 93 David Pearce | Matt Hammond | Renee Shike (more…)

Christmas shut down: Contractual payment regime read down to align with BIF Act   

Allencon Pty Ltd v Palmgrove Holdings Pty Ltd [2022] QDC 90 Andrew Orford  |  Petrina MacPherson |  Eva Squire (more…)

Pleading defects not served by delivering defective pleading     

Devine Constructions Pty Ltd v Stowe Australia Pty Ltd & Ors [2022] QSC 51 Julie Whitehead   |  James Knell  |  Zariyah Ahmed (more…)

Shed-ding light on building classifications in the QBCC Act     

Ruhle v Lormist Pty Ltd [2022] QCAT 100 Andrew Orford  |  Alexandria Hammerton |  Eva Squire (more…)

Compliance with the QBCC Act is a matter for the QBCC  

Widdows v Pacific Blue Painting Pty Ltd & Anor [2022] QCAT 114 Clare Turner |  Sam Rafter |  Yibing Mao (more…)

Glossary Term

Title

Description